Sign Up
Milton.com helps you connect and share with the people in your community.

by
Fifth Line, from Main Street extending 350 metres north, is closed until July 10 for the installation of a wastewater main.

The Region of Halton suggests drivers use Sixth Line, Derry Road and Steeles Avenue to avoid the area. There are also temporary road closure signage and detour routes posted on Fifth Line.

The project is part of Building a Better Halton, the Region’s infrastructure construction plan for roads, water, wastewater and waste management projects. The aim of the plan is to improve the quality of life for Halton residents through reduced commute and drive times, high-quality water supply and wastewater collection, and the establishment of sustainable communities.

A map showing the affected area can be found at halton.ca/construction.

------------------------------------------------------- ------------------------------------------------------- ----------------

Detail Link :

http://www.insidehalton.com/news-story/5605102-section-of-fifth-line-closed-for-construction/
Captcha Challenge
Reload Image
Type in the verification code above